







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
IKO Kitchen Remodeling: The Miami Owner’s Guide
If you have an IKO kitchen feature that’s failing, here’s the straight answer: we supply and install IKO-compatible kitchen remodeling components throughout Miami, with typical projects running $16,520 – $53,100 depending on scope, cabinet line, and countertop material. Most owners discover the problem the same way you probably did: a drawer that no longer closes flush, a hinge that’s stripped, a cabinet box that’s pulled away from the wall, or finish peeling around the sink base. We keep common IKO-compatible hardware and trim on our trucks and source the rest directly, so you’re not waiting on a mystery backorder while your kitchen sits half-functional.
Here’s what you need to know to match the right part, understand what actually fails, and get a written price before anyone picks up a tool. Give you a number first, then pick up the tools.
Which IKO Models This Applies To

IKO operates primarily as a roofing and building materials manufacturer, so when we talk about IKO kitchen remodeling in Miami, we’re usually dealing with two scenarios: homes where IKO waterproofing membranes or underlayments were used beneath tile and flooring during the original kitchen build, and homes where IKO-branded millwork or trim was spec’d by the builder. The compatibility question hinges on what’s underneath, not just what’s visible.
Pull the soft-close hinge off one cabinet door and check the cup diameter. European-style concealed hinges come in 26mm and 35mm cups, and if your IKO-spec cabinetry uses an uncommon 26mm bore, a generic 35mm hinge from a big-box store will not seat properly. That’s the kind of compatibility gotcha we see regularly in Coconut Grove homes where original builds from the 1980s and 1990s mixed supplier lines. For membrane and underlayment work, IKO’s AquaBarrier and similar products have specific overlap and fastener requirements under Miami code, and repairing a failed tile installation often means matching the original waterproofing layer rather than just resetting tile. When OEM IKO trim is unavailable, we recommend specific aftermarket equivalents that match profile and material rather than whatever’s closest on the shelf.
Styles & brands we work with







Signs Your IKO Kitchen Remodeling Is Failing
- Cabinet doors sag or won’t stay closed. Soft-close hardware wears out faster in Miami’s humidity because the internal dampening grease breaks down or hinges accumulate corrosion. The door doesn’t sit square, and adjusting the screw no longer helps.
- Visible water staining or swelling at the cabinet toe kick or sink base. If IKO membrane or underlayment was installed incorrectly at the original build, moisture wicks up through the floor assembly and the particleboard soaks it like a sponge. Swelling near the seams is the tell.
- Grout lines cracking or tiles lifting near the range and sink. Miami’s slab-on-grade homes shift with seasonal moisture changes in the soil, and a rigid tile assembly over a failed underlayment will telegraph movement as hairline cracks first, then popped tiles.
- Laminate or veneer peeling at the cabinet fronts and drawer edges. High humidity plus heat from cooking breaks down the adhesive layer on IKO-spec laminate surfaces. Once an edge lifts, moisture gets behind it and the peeling accelerates.
- Drawer slides binding or pulling the box apart. Inexpensive side-mount slides installed at original build were never rated for the weight homeowners actually put in them. The screws strip from the particleboard, the drawer racks, and eventually the box separates at the joinery.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

In Miami, IKO kitchen remodeling replacement work typically runs $16,520 – $53,100 as a complete scope. That range breaks into smaller pieces: cabinet installation alone runs $4,720 – $15,340, countertop installation $2,360 – $7,670, and backsplash work $945 – $2,950. What drives the number up or down is the cabinet line (stock versus semi-custom like KraftMaid or Wellborn), the countertop material (Cambria quartz runs higher than standard granite; Silestone adds its own warranty layer alongside ours), and whether we’re preserving or replacing the existing IKO waterproofing system underneath.
Every price we give is line-item written before work starts, not a verbal range that changes when the crew arrives. The written price covers parts, labor, haul-off, and the permit if the scope requires one. And every job carries our 365-Day Done Right Promise: if it fails within the guarantee period, we come back and fix it at no charge. If a repair fails, the second visit is free. No service call fee, no re-inspection charge.
DIY or Call Us?
Some things are worth checking yourself before you call anyone. If a cabinet door is misaligned, tighten the hinge screws slowly and see if the plate is still solid in the bore. If the screw spins freely, the hole is stripped and that’s repairable with a proper dowel-and-glue method. If you can see water staining, use a moisture meter (about $30 at any hardware store in Miami) on the toe kick and cabinet floor near the sink. Readings above 12% in particleboard mean active moisture. That’s a sign to stop and get a professional look.
Where DIY goes wrong is trying to replace membrane or underlayment without pulling the assembly apart properly. Cutting corners on waterproofing under tile in a Miami kitchen means you’re rebuilding it again in two years. If you’re not sure what you’re looking at, call (850) 988-7559. We’ll walk you through what we’re seeing before we ever schedule a visit.
FAQs

With proper installation and a functioning moisture barrier, cabinet systems and tile assemblies last 20 to 30 years in South Florida, but hardware like hinges and slides realistically needs replacement every 8 to 12 years due to humidity-driven corrosion and wear. Soft-close mechanisms fail first. Call (850) 988-7559 and we’ll tell you what’s worth replacing versus what just needs adjustment.
In many cases yes, if the cabinet boxes are sound and the waterproofing layer is intact, we can replace hardware, reface doors, and reset tile without a full teardown. If the membrane under the floor has failed or the cabinet boxes have swollen past structural integrity, repair stops making financial sense. We’ll show you the evidence either way before you commit to a dollar amount.
A hardware and trim replacement runs a day or two; a full cabinet and countertop replacement in a Miami kitchen typically takes 3 to 6 weeks depending on cabinet lead time and whether countertop templating is involved. We give you a written schedule and a real arrival window before work starts, and the schedule doesn’t change silently.
We stock common IKO-compatible cabinet hardware, hinges, slides, and trim profiles on our trucks, and we source membrane and underlayment products from local distributors in Miami with 2 to 5 day lead times. We also work with KraftMaid, Cambria, and Silestone for cabinet and countertop replacements. Call (850) 988-7559 for a free estimate and we’ll verify availability before you schedule anything.
Ready for the actual number? Call Penhallow Remodeling Miami at (850) 988-7559 for a free estimate. You’ll get a written price before any work starts, a defined arrival window, and a written 365-day guarantee on the job. A real person answers, any hour.
Written by Trevor Nash, Owner, Penhallow Remodeling Miami at Penhallow Remodeling Miami, serving Miami and nearby areas.


